جسر المشي المنسق

فيديوهات أخرى
August 23, 2024
موجز: Discover the PB100 Portable Steel Modular Footbridge, a cost-effective and lightweight solution for pedestrian and cyclist crossings. Designed for remote rural areas, this modular footbridge offers fast construction, durability, and easy transportation. Perfect for connecting communities across rivers, highways, and more.
خصائص المنتج ذات الصلة:
  • Lightweight steel construction for easy transportation and assembly.
  • High strength and stiffness, reducing self-weight and structural height.
  • Prefabricated components ensure fast construction and minimal site disruption.
  • Standardized design allows for easy repair, replacement, and recycling.
  • Durable with zinc galvanization to prevent rust and ensure longevity.
  • Suitable for temporary or permanent use in urban and rural settings.
  • Simple structure with controllable costs and moderate construction difficulty.
  • Long span design minimizes riverbed disturbance and maximizes flow efficiency.
الأسئلة:
  • What is the maximum load capacity of the PB100 Modular Footbridge?
    The PB100 Modular Footbridge is designed with a loading capacity of 3kN/m2, suitable for pedestrian and cyclist use but not for vehicles or heavy machinery.
  • How is the PB100 Modular Footbridge transported to remote locations?
    The lightweight and modular design allows components to be easily transported manually or with minimal machinery, making it ideal for rugged and remote terrains.
  • What are the maintenance requirements for the PB100 Modular Footbridge?
    The footbridge requires minimal maintenance due to its zinc galvanization, which prevents rust, and its modular design allows for easy replacement of any damaged parts.
فيديوهات ذات علاقة

مصنع (إيفيركروس)

مصنع (إيفيركروس)
August 26, 2024

عجلة جلخ جلخ

أدوات جلخ
November 12, 2024

مصنع (إيفيركروس)

مصنع (إيفيركروس)
August 26, 2024

مصنع إيفير كروس 2

مصنع (إيفيركروس)
August 26, 2024

الجسر النموذجي 3

جسر ستيل بيلي
August 23, 2024

جسر وحدات 2

جسر ستيل بيلي
August 23, 2024

رصيف جسر بيلي

جسر بيلي
August 20, 2024

تسليم مشروع موزمبيق

مصنع (إيفيركروس)
January 07, 2026